Friday, July 3, 2009

Rock Bridge... Chevrolet!?

It's not quite official until we sign the dotted line but unless something CRAZY happens; as of August 1st we will move into Rock Bridge Chatsworth located at: 2402 Highway 76, Chatsworth GA 30705 - "The old Harris-Sutton Chevy building"

So how did we get here? Here's a little history:

1. In Autumn of 2008 the church was already thinking about Rock Bridge Chatsworth.

2. In the midst of that, Gail and I drove by the building and she said "hey look, that would be a great place for Rock Bridge Chatsworth. We started praying!

3. Fast-forward to Spring 2009. Rock Bridge leadership affirmed unanimously that God was calling us to Chatsworth and I was affirmed to become the campus pastor.

4. While we are people centered, not building centered, the 'Chevy' building remained our first choice for location. After fasting, prayer and some visits to the site we made contact with Appalachian Bank to see if there was a way Rock Bridge could lease the space.

5. After much prayer and meeting time, we agreed on a lease that was meaningful to both the church and the bank!

6. I cannot say enough how thankful I am to Gary and the folks at Appalachian Bank. They have gone WAY above and beyond the call to make this possible for us, proving their commitment to our community. Please join me in praying that God will bless these folks as they have blessed us!

So there it is! I'll post info about 'work days' VERY soon!

No comments:

Post a Comment